

Flamestone Ltd were engaged by a large pharmaceutical manufacturer to design and execute a full AHU refurbishment for a unit dedicated to a critical clean blister packaging room production facility. Flamestone surveyed the unit extensively and employed a leading UK AHU manufacturer to carry out fan, damper, filter and 2-stage DX coil replacement.
Flamestone also procured the supply and installation of new DX condensing units to serve the replacement coil along with careful integration of all new equipment with the existing building controls.
The works were programmed and managed by Flamestone, to suit a planned shut-down period which ensured that the facility was out of production for a minimal amount of time.